The Queens Hotel refurbishments progress

The Queens Hotel refurbishments progress

With phase 1 of the Queens Hotel refurbishments well underway, phase 2 got started on the 17th November, which includes 21 bedrooms, 2 lounges, 1 bar, 1 restaurant and an open display kitchen – so a busy time for everyone over the next 3 months!

Here are a few pictures, which show phase 2 starting to take shape…

 

The bedrooms…

The remaining 21 bedrooms of phase 2 are all at the front of the hotel, they have been emptied and completely stripped bare, with major alterations taking place on two rooms, to turn them into disabled access. The lift is due to be replaced with a brand new lift and the corridors and staircase are all getting a fresh new look. The below colour schemes are provided to give you an idea of what the bedroom are going to look like…

 

The ground floor has also been completely stripped bare to start the refurbishments on the reception, walk through lounge, which will lead into the new 64 seater restaurant, the open display kitchen and bar area. The below colour schemes have been set out to give you an idea of how the ground floor will look…

 

We shall update you again later in the New Year… so make sure to keep an eye out for our next blog…